bloxhomes.ca
Open in
urlscan Pro
198.49.23.144
Public Scan
URL:
https://bloxhomes.ca/
Submission Tags: phishingrod
Submission: On August 30 via api from DE — Scanned from CA
Submission Tags: phishingrod
Submission: On August 30 via api from DE — Scanned from CA
Form analysis
0 forms found in the DOMText Content
BLOX HOMES SOLVING ONTARIO’S HOUSING CRISES IN 2023 -------------------------------------------------------------------------------- ONTARIO’S HOUSING SHORTAGE * To meet population growth Ontario needs to construct 180,000 housing units per year * Unfortunately, the Ontario Construction Industry is only capable of producing 70,000 housing units per year * This deficit of 110,000 housing units is caused by chronic skilled labour shortages * If a genie provided Ontario builders with free land and materials, they would be unable to keep up with demand due to labour constraints * In addition, 10% of construction workers are retiring in 5 years, which will only grow this shortage to 121,000 annual units Ontario's Annual Housing Supply, Demand, and Deficit * Demand * Supply * Deficit * Demand * Supply * Deficit WHAT’S THE SOLUTION? * Ontario needs a technology that will meet demand with minimal labour * A technology so simple that anyone can build with * A technology that * Builds 1 home * With 3 workers * In 1 month ONTARIO NEEDS BLOX by Julii & Co Inc. WHAT ARE BLOX? -------------------------------------------------------------------------------- LIFE-SIZE LEGO BLOCKS Blox are pre-engineer structural building products with a built in moisture barrier CONSTRUCTION SIMPLIFIED Blox have build in venting, electric, and plumbing runs & penetrations SELF ASSEMBLY Blox are rapidly and easily assembled thanks to a Julii & Co. Inc. made conveyor belt with ZERO need for mortar NO EXTERIOR CLADDING Blox require ZERO exterior cladding since the exterior assembly is the cladding NO DRYWALL Blox homes require ZERO drywall, drywall joint compound is applied directly onto the Blox interior surface WIDE SELECTION OF COLOURS & TEXTURES Blox are available in chino smooth, burnt sienna stone, tan wood, gold sand artisan brick, and many more BLOX STRUCTURAL REQUIREMENTS Blox exceed building code structural requirements by using 6" solid concrete block interior and exterior walls BLOX FIRE RATING Unlike lumber, concrete is a non-combustible substance which offer a 4-hour+ fire rating BLOX INSULATION RATING Blox meets building code insulation levels with R22 walls and R31 roof insulation (without attic) WHAT IS A BLOX HOUSE? -------------------------------------------------------------------------------- A Blox home can be built to suit almost any construction style: * Traditional * Transitional * Modern Blox can be used to construct: * Detached homes * Semi-Detached * Row housing * Multi unit low-rise, up to 5 stories BLOX TECHNICAL SPECIFICATIONS -------------------------------------------------------------------------------- INDIVIDUAL BLOX UNIT -------------------------------------------------------------------------------- BLOX STANDARD WALL ASSEMBLY -------------------------------------------------------------------------------- BLOX WALL ASSEMBLY ELECTRICAL AND PLUMBING SUPPLY -------------------------------------------------------------------------------- BLOX WALL ASSEMBLY PLUMBING RETURN -------------------------------------------------------------------------------- BLOX FLAT ROOF ASSEMBLY -------------------------------------------------------------------------------- BLOX PITCHED ROOF ASSEMBLY -------------------------------------------------------------------------------- WATER PROOFING, ROOF AND PARAPET (PAINTABLE SURFACE) -------------------------------------------------------------------------------- STANDARD TEXTURES (CUSTOM TEXTURES ALSO AVAILABLE) Smooth Exposed Aggregate Medium Sand Venetian Stucco Lowell Billerica Ipswich Tree Bark 0.75" Fractured Fin 1.50" Fractured Fin Flat Fractured Rib Sound Absorption 3.00′′ Cedar Cedar Stakes Exaggerated Board & Batten Stacked Bond Split Block Split Stone Coral Ashlar -------------------------------------------------------------------------------- COLOURS No Colour Steel Grey Saddle Brown Ledge Stone Woodland Brown Amsterdam Red Pearl Beige Camouflage Tan Earth Tone Honey Brown Premium Red Arizona Tile THE BLOX PROCESS -------------------------------------------------------------------------------- LEGO INSPIRED Blox have been inspired by Legos, so that even a child could build with this technology MADE IN ONTARIO Blox are made from solid concrete into a many different textures and colours DELIVERY Blox are delivered to the job-site on a flat-bed truck STACKED IN PLACE Once the Blox arrive on site they are stacked in place by out team. It takes about 10 seconds per Blox WALL REINFORCEMENT Once the Blox are stacked in place, they are reinforced with fiberglass rebar, which is superior to steel WALL INSULATION (R22) Insulation is installed between the exterior and interior walls. Which is made from 80% recycled content FLOOR AND CEILING FORMWORK Flat forms are setup prior to the floor and ceiling concrete pours FLOOR AND ROOF REINFORCEMENT Floor and roof rebar is installed, and then in-floor pex tubbing is attached to the rebar FLOORS AND CEILINGS POUR Floors and ceiling concrete pours are pored with a self-consolidating concrete CEILING INSULATION (R31) Ceiling insulation is installed ROOF TOPPING Concrete roof topping is installed. A pitch roof can be installed by a third party, but is not necessary WATERPROOFING All below grade walls, roof surfaces, and parapets are waterproofed THE BLOX TEAM -------------------------------------------------------------------------------- Michal Jaster Innovation Manager & GM B.Com. 5+ years of construction innovation Founder and owner of Julii & Co. Inc. Mohamed Khalil Structural Engineer Ph.D., P.Eng., MBA. 20+ years in concrete & steel design Engineering and business educator COMPETITIVE ANALYSIS -------------------------------------------------------------------------------- Lumber Framing (Sticks & Bricks) Insulated Concrete Forms (ICF) Blox CategoryFramingICFBloxArchitectural design*HIGH InputHIGH Inputlow inputFooting, foundation, and roof design*HIGH InputHIGH Inputlow inputRoof Design*HIGH InputHIGH Inputlow inputHVAC design & install*HIGH InputHIGH Inputlow inputElectrical design & install*HIGH InputHIGH Inputlow inputPlumbing design & install*HIGH InputHIGH Inputlow inputFoundation install*HIGH InputHIGH Inputlow inputInsulation, below grade*Medium Inputlow inputlow inputConcrete pour*low inputHIGH InputMedium InputConcrete finishing*HIGH InputHIGH Inputlow inputFraming*HIGH InputMedium Inputzero inputMoisture Barrier, above grade*zero inputHIGH Inputzero inputMoisture Barrier, above grade*HIGH InputHIGH Inputlow inputRoof Install, third party*HIGH InputHIGH Inputzero inputInsulation, above grade*HIGH Inputlow inputlow inputSiding, brick, stone or stucco cladding*HIGH InputHIGH Inputzero inputWindow & door install*HIGH InputHIGH Inputlow inputDrywalling*HIGH InputHIGH Inputzero inputDrywall Compound*Medium InputMedium InputMedium InputPainting*Medium InputMedium InputMedium InputFlooring*Medium InputMedium InputMedium InputTrim*HIGH InputHIGH Inputlow inputInfloor Heating on every floornonoYESBuilt in electrical conduit?nonoYESBuilt in plumbing runs?nonoYESSoundproofing between rooms and floors?low inputMedium InputMedium InputEnergy savings vs typical build?0%60%60%Build durability, exterior.Medium DurablityHIGH DurabilityHIGH DurabilityBuild durability, interior.low DurablityHIGH DurabilityHIGH DurabilityConstruction time (months).6-125-101-3Can technology solve Housing Crisis?nonoYESPatented in Canada, USA, and Europe?nonoYESCan raw materials be built on job site?nonoYES *Required labour inputs for each type of technology **Blox are produced in a factory to achieve maximum efficiency, however Blox can be produced anywhere in the world as long as there is access for a concrete truck FREQUENTLY ASKED QUESTIONS -------------------------------------------------------------------------------- * ARE BLOX THE SAME THING AS ICF? * Fortunately Blox and ICF are not the same * Blox take the best part of ICF, the easy stacking, and eliminate the worst part, the bracing and finishing * ICF is a insulation, concrete, insulation technology, while Blox are concrete, insulation, concrete * HOW COME NO ONE ELSE HAS COME UP WITH THIS IDEA? * Frankly we’re surprised that this solution is a brand new concept, the reason Blox came about is because the founders could not find affordable housing * WHICH BUILDER CAN USE BLOX? * Any builder registered with the Ontario Home Construction Regulatory Authority is able to build with Blox * MY BUILDER HAS NEVER HEARD OF BLOX BEFORE * Blox have been in development since 2018 and are just arriving on the market now, very shortly all builders will be familiar with Blox * HOW DO I HANG A PICTURE? * Same as you would into a wooden stud, with a drill and a screw, the difference is that any part of a Blox wall is a structural element, so you can hang up a picture, a TV, or even punching bag on any part of the wall or ceiling * ISN’T CONCRETE COLD? * Uninsulated concrete walls are really cold, but luckily the insulation between the interior and exterior walls keep the house really warm in the winter and cool in the summer * WHAT IF I WANT TO MOVE A WALL LATER ON? * That’s possible, more difficult than a stud wall, but totally doable UPCOMING PROJECTS -------------------------------------------------------------------------------- Blox will be used to build a minimalist cottage 90 minutes north of Toronto in 2024. PRICING -------------------------------------------------------------------------------- Below is an instant rough pricing calculator for a 2 story detached home with a finished basement, and an interior garage Price Includes * Stamped construction drawings (architectural, structural, M.E.P., and site plan) * Delivery to site, anywhere between Windsor, Sudbury, and Ottawa * All labour and material * Footings * Exterior Wall * Cladding * Insulation (cellulose R22 continuous, as per OBC Compliance Package A1) * Waterproofing, below grade * Interior Wall * M.E.P. penetrations * Smooth drywall like finish readying for tapping and mudding * Interior Floor slabs * Ceiling and floor slabs * Built in pex for in-floor heating * Roof * insulation, (XPS R31, as per OBC Compliance Package A1 Ceiling Without Attic Space) * Flat roof topping, parapet or slope for pitched roof, * Waterproofing * Stairs, all stairs and landing assemblies * Door/Window bucks Instant Pricing Calculator* Blox Homes Estimator Online Footing Slab area (sq. ft.) 0 Exterior Wall depth (ft.) 0 Exterior Wall width (ft.) . 0 Exterior Wall height (ft.) 1 Exterior Wall area (ft.) 0 Exterior Wall waterproofing 0 Exterior Wall RSO area (sq. ft.) 0 Exterior Wall Bucks Door/Window length (ft.) 0 Interior Wall length (ft.) 0 Interior Wall RSO (sq. ft.) 0 Ceiling Slab area (sq. ft.) 0 Stairway assemblies (units) 0 Exterior Wall length (ft.) 0 Exterior Wall width (ft.) . 0 Exterior Wall height (ft.) Exterior Wall area (ft.) 0 Exterior Wall waterproofing 0 Exterior Wall RSO area (sq. ft.) 0 Exterior Wall Bucks Door/Window length (ft.) 0 Interior Wall length (ft.) 0 Interior Wall RSO (sq. ft.) 0 Ceiling Slab area (sq. ft.) 0 Stairway assemblies (units) 1 Exterior Wall length (ft.) 0 Exterior Wall width (ft.) . 0 Exterior Wall height (ft.) Exterior Wall area (ft.) 0 Exterior Wall waterproofing 0 Exterior Wall RSO area (sq. ft.) 0 Exterior Wall Bucks Door/Window length (ft.) 0 Interior Wall length (ft.) 0 Interior Wall RSO (sq. ft.) 0 Ceiling Slab area (sq. ft.) 0 Stairway assemblies (units) 1 Exterior Wall length (ft.) Exterior Wall width (ft.) . Exterior Wall height (ft.) Exterior Wall area (ft.) 0 Exterior Wall waterproofing 0 Exterior Wall RSO area (sq. ft.) Exterior Wall Bucks Door/Window length (ft.) Interior Wall length (ft.) Interior Wall RSO (sq. ft.) Ceiling Slab area (sq. ft.) 0 Stairway assemblies (units) 0 Exterior Wall length (ft.) Exterior Wall width (ft.) . Exterior Wall height (ft.) Exterior Wall area (ft.) 0 Exterior Wall waterproofing 0 Exterior Wall RSO area (sq. ft.) Exterior Wall Bucks Door/Window length (ft.) Interior Wall length (ft.) Interior Wall RSO (sq. ft.) Ceiling Slab area (sq. ft.) 0 Stairway assemblies (units) 0 Exterior Wall length (ft.) Exterior Wall width (ft.) . Exterior Wall height (ft.) Exterior Wall area (ft.) 0 Exterior Wall waterproofing 0 Exterior Wall RSO area (sq. ft.) Exterior Wall Bucks Door/Window length (ft.) 0 Interior Wall length (ft.) Interior Wall RSO (sq. ft.) Ceiling Slab area (sq. ft.) Stairway assemblies (units) 0 Roof Insulation, Topping + Waterproofing area (sq. ft.) 1 Roof Parapet length (ft.) 0 Roof Parapet waterproofing area (sq. ft.) 0 # Item Quantity Cost Unit Cost Total Margin Profit Unit Profit Total Price Unit Price Total Blox Specifications 2 - Input, Julii Wall, exterior thickness (ft.) 1.50 2 - Input, Julii Wall, interior thickness (ft.) 3 - Output, Hide Margin, all items Exterior Wall Length 1 - Input, User Building length exterior (ft.) 0 1 - Input, User Building width exterior (ft.) 0 Exterior Wall Heights 1 - Input, User Exterior Frost-Wall/Basement height (ft.) 1.00 1 - Input, User Exterior Ground Floor wall height (ft.) 10.00 1 - Input, User Exterior Second Floor wall height (ft.) 10.00 1 - Input, User Exterior Third Floor wall height (ft.) 0.00 1 - Input, User Exterior Fourth Floor wall height (ft.) 0.00 1 - Input, User Exterior Fifth Floor wall height (ft.) 0.00 Exterior Wall Perimeter 1 - Input, User Exterior Frost-Wall/Basement wall length 0.00 1 - Input, User Exterior Ground Floor wall length (ft.) 0.00 1 - Input, User Exterior Second Floor wall length (ft.) 0.00 1 - Input, User Exterior Third Floor wall length (ft.) 0.00 1 - Input, User Exterior Fourth Floor wall length (ft.) 0.00 1 - Input, User Exterior Fifth Floor wall length (ft.) 0.00 Exterior Wall Area 1 - Input, User Exterior Frost-Wall/Basement wall area 0.00 1 - Input, User Exterior Ground Floor wall area (sq. ft.) 0.00 1 - Input, User Exterior Second Floor wall area (sq. ft.) 0.00 1 - Input, User Exterior Third Floor wall area (sq. ft.) 0.00 1 - Input, User Exterior Fourth Floor wall area (sq. ft.) 0.00 1 - Input, User Exterior Fifth Floor wall area (sq. ft.) 0.00 Exterior Wall RSO Area 1 - Input, User Exterior Frost-Wall/Basement RSO area (sq. ft.) 0.00 1 - Input, User Exterior Ground Floor wall RSO area (sq. ft.) 0.00 1 - Input, User Exterior Second Floor wall RSO area (sq. ft.) 0.00 1 - Input, User Exterior Third Floor wall RSO area (sq. ft.) 0.00 1 - Input, User Exterior Fourth Floor wall RSO area (sq. ft.) 0.00 1 - Input, User Exterior Fifth Floor wall RSO area (sq. ft.) 0.00 Drawings (architectural, structural, M.E.P., Site plan) 2 - Input, Julii Exterior Frost-Wall/Basement RSO area (sq. ft.) 0.00 5.00 $0.00 25% $1.67 $0.00 $6.67 $0.00 Exterior Wall Window and Door Bucks 1 - Input, User Exterior Frost-Wall/Basement Buck area (sq. ft.) 0.00 37.53 $0.00 25% $12.51 $0.00 $50.04 $0.00 1 - Input, User Exterior Ground Floor wall Buck area (sq. ft.) 0.00 37.53 $0.00 25% $12.51 $0.00 $50.04 $0.00 1 - Input, User Exterior Second Floor wall Buck area (sq. ft.) 0.00 37.53 $0.00 25% $12.51 $0.00 $50.04 $0.00 1 - Input, User Exterior Third Floor wall Buck area (sq. ft.) 0.00 37.53 $0.00 25% $12.51 $0.00 $50.04 $0.00 1 - Input, User Exterior Fourth Floor wall Buck area (sq. ft.) 0.00 37.53 $0.00 25% $12.51 $0.00 $50.04 $0.00 1 - Input, User Exterior Fifth Floor wall Buck area (sq. ft.) 0.00 37.53 $0.00 25% $12.51 $0.00 $50.04 $0.00 Exterior Wall Area less RSO 1 - Input, User Exterior Frost-Wall/Basement wall area less RSO (sq. ft.) 0.00 $19.77 $0.00 25% $6.59 $0.00 $26.36 $0.00 1 - Input, User Exterior Ground Floor wall area less RSO (sq. ft.) 0.00 $19.77 $0.00 25% $6.59 $0.00 $26.36 $0.00 1 - Input, User Exterior Second Floor wall area less RSO (sq. ft.) 0.00 $19.77 $0.00 25% $6.59 $0.00 $26.36 $0.00 1 - Input, User Exterior Third Floor wall area less RSO (sq. ft.) 0.00 $19.77 $0.00 25% $6.59 $0.00 $26.36 $0.00 1 - Input, User Exterior Fourth Floor wall area less RSO (sq. ft.) 0.00 $19.77 $0.00 25% $6.59 $0.00 $26.36 $0.00 1 - Input, User Exterior Fifth Floor wall area less RSO (sq. ft.) 0.00 $19.77 $0.00 25% $6.59 $0.00 $26.36 $0.00 Exterior Wall Waterproofing 1 - Input, User Exterior Waterproofing area (sq. ft.) 0.00 $4.50 $0.00 25% $1.50 $0.00 $6.00 $0.00 Interior Ceiling Heights 1 - Input, User 0.00 9.00 9.00 1 - Input, User Interior Third Floor ceiling height (ft.) 0.00 1 - Input, User Interior Fourth Floor ceiling height (ft.) 0.00 1 - Input, User Interior Fifth Floor ceiling height (ft.) 0.00 Interior Wall Measurements 1 - Input, User Interior Frost-Wall/Basement wall length (ft.) 0.00 1 - Input, User Interior Ground Floor wall length (ft.) 0.00 1 - Input, User Interior Second Floor wall length (ft.) 0.00 1 - Input, User Interior Third Floor wall length (ft.) 0.00 1 - Input, User Interior Fourth Floor wall length (ft.) 0.00 1 - Input, User Interior Fifth Floor wall length (ft.) 0.00 Interior Wall Area 1 - Input, User Interior Frost-Wall/Basement wall area (sq. ft.) 0.00 1 - Input, User Interior Ground Floor wall area (sq. ft.) 0.00 1 - Input, User Interior Second Floor wall area (sq. ft.) 0.00 1 - Input, User Interior Third Floor wall area (sq. ft.) 0.00 1 - Input, User Interior Fourth Floor wall area (sq. ft.) 0.00 1 - Input, User Interior Fifth Floor wall area (sq. ft.) 0.00 Interior Wall RSO Area 1 - Input, User Interior Frost-Wall/Basement RSO area (sq. ft.) 0.00 1 - Input, User Interior Ground Floor RSO area (sq. ft.) 0.00 1 - Input, User Interior Second Floor RSO area (sq. ft.) 0.00 1 - Input, User Interior Third Floor RSO area (sq. ft.) 0.00 1 - Input, User Interior Fourth Floor RSO area (sq. ft.) 0.00 1 - Input, User Interior Fifth Floor RSO area (sq. ft.) 0.00 Interior Wall Area less RSO 1 - Input, User Interior Frost-Wall/Basement wall area less RSO (sq. ft.) 0.00 8.92 $0.00 25% $2.97 $0.00 $11.90 $0.00 1 - Input, User Interior Ground Floor wall area less RSO (sq. ft.) 0.00 8.92 $0.00 25% $2.97 $0.00 $11.90 $0.00 1 - Input, User Interior Second Floor wall area less RSO (sq. ft.) 0.00 8.92 $0.00 25% $2.97 $0.00 $11.90 $0.00 1 - Input, User Interior Third Floor wall area less RSO (sq. ft.) 0.00 8.92 $0.00 25% $2.97 $0.00 $11.90 $0.00 0.00 8.92 $0.00 25% $2.97 $0.00 $11.90 $0.00 0.00 8.92 $0.00 25% $2.97 $0.00 $11.90 $0.00 Levels 1 - Input, User Total levels above ground 2.00 Bent Rebar 2 - Input, Julii Rebar Connecting exterior wall to floor/ceiling slab perimeter (ft.) 0.00 2 - Input, Julii Rebar Perimeter X Floors 0.00 1.38 $0.00 25% $0.46 $0.00 $1.83 $0.00 Stairs Basement 1 Interior Frost-Wall/Basement ceiling height (ft.) 0 3 - Output, Hide Stair rise individual maximum height (ft.) 3 - Output, Hide Stair quantity (units) 0.00 3 - Output, Hide Stair quantity rounded up (units) 0.00 3 - Output, Hide Stair rise individual height (ft.) NaN 3 - Output, Hide Stair run individual length (ft.) 3 - Output, Hide Stair run total length (ft.) 0.00 3 - Output, Hide Stair concrete step individual area (sq. ft.) NaN 2 - Input, Julii Staircase width (ft.) 3 - Output, Hide Stair concrete step individual volume (cu. ft.) NaN 3 - Output, Hide Stair concrete step total volume (cu. ft.) NaN 2 - Input, Julii Staircase landing width (ft.) 8 2 - Input, Julii Staircase landing length (ft.) 4 3 - Output, Hide Staircase landing area (sq. ft.) 32.00 3 - Output, Hide Staircase landing slab depth (sq. ft.) NaN 3 - Output, Hide Staircase landing volume (cu. ft.) NaN 3 - Output, Hide Staircase concrete steps + landing total volume (cu. ft.) NaN 3 - Output, Hide Staircase steps + landing footprint (sq. ft.) 0.00 2 - Input, Julii Basement Stairways (total assemblies) 0.00 5 - Price Stair total assemblies (sq. ft.) 0.00 $15.56 $0.00 25% $5.19 $0.00 $20.75 $0.00 Stairs Ground Floor 1 - Input, User Interior Ground Floor ceiling height (ft.) 9.00 3 - Output, Hide Stair rise individual maximum height (ft.) 3 - Output, Hide Stair quantity (units) 13.04 3 - Output, Hide Stair quantity rounded up (units) 14.00 3 - Output, Hide Stair rise individual height (ft.) 0.64 3 - Output, Hide Stair run individual length (ft.) 3 - Output, Hide Stair run total length (ft.) 10.08 3 - Output, Hide Stair concrete step individual area (sq. ft.) 0.46 2 - Input, Julii Stair concrete step individual width (ft.) 4.00 3 - Output, Hide Stair concrete step individual volume (cu. ft.) 1.85 3 - Output, Hide Stair concrete step total volume (cu. ft.) 25.92 2 - Input, Julii Staircase landing width (ft.) 8.00 2 - Input, Julii Staircase landing length (ft.) 4.00 3 - Output, Hide Staircase landing area (sq. ft.) 32.00 3 - Output, Hide Staircase landing slab depth (sq. ft.) 0.64 3 - Output, Hide Staircase landing volume (cu. ft.) 20.57 3 - Output, Hide Staircase concrete steps + landing total volume (cu. ft.) 46.49 3 - Output, Hide Staircase steps + landing footprint (sq. ft.) 40.32 2 - Input, Julii Ground Floor Stairways total (assemblies) 1.00 5 - Price Stair total assemblies (sq. ft.) 40.32 $15.56 $627.38 25% $5.19 $209.13 $20.75 $836.50 Stairs Second Floor 1 - Input, User Interior Second Floor ceiling height (ft.) 9.00 3 - Output, Hide Stair rise individual maximum height (ft.) 3 - Output, Hide Stair quantity (units) 13.04 3 - Output, Hide Stair quantity rounded up (units) 14.00 3 - Output, Hide Stair rise individual height (ft.) 0.64 3 - Output, Hide Stair run individual length (ft.) 3 - Output, Hide Stair run total length (ft.) 10.08 3 - Output, Hide Stair concrete step individual area (sq. ft.) 0.46 2 - Input, Julii Stair concrete step individual width (ft.) 4.00 3 - Output, Hide Stair concrete step individual volume (cu. ft.) 1.85 3 - Output, Hide Stair concrete step total volume (cu. ft.) 25.92 2 - Input, Julii Staircase landing width (ft.) 8.00 2 - Input, Julii Staircase landing length (ft.) 4.00 3 - Output, Hide Staircase landing area (sq. ft.) 32.00 3 - Output, Hide Staircase landing slab depth (sq. ft.) 0.64 3 - Output, Hide Staircase landing volume (cu. ft.) 20.57 3 - Output, Hide Staircase concrete steps + landing total volume (cu. ft.) 46.49 3 - Output, Hide Staircase steps + landing footprint (sq. ft.) 40.32 2 - Input, Julii Stair ways total (assemblies) 1.00 5 - Price Stair total assemblies (sq. ft.) 40.32 $15.56 $627.38 25% $5.19 $209.13 $20.75 $836.50 Stairs Third Floor 1 - Input, User Interior Second Floor ceiling height (ft.) 9.00 3 - Output, Hide Stair rise individual maximum height (ft.) 3 - Output, Hide Stair quantity (units) 13.04 3 - Output, Hide Stair quantity rounded up (units) 14.00 3 - Output, Hide Stair rise individual height (ft.) 0.64 3 - Output, Hide Stair run individual length (ft.) 3 - Output, Hide Stair run total length (ft.) 10.08 3 - Output, Hide Stair concrete step individual area (sq. ft.) 0.46 2 - Input, Julii Stair concrete step individual width (ft.) 4.00 3 - Output, Hide Stair concrete step individual volume (cu. ft.) 1.85 3 - Output, Hide Stair concrete step total volume (cu. ft.) 25.92 2 - Input, Julii Staircase landing width (ft.) 8.00 2 - Input, Julii Staircase landing length (ft.) 4.00 3 - Output, Hide Staircase landing area (sq. ft.) 32.00 3 - Output, Hide Staircase landing slab depth (sq. ft.) 0.64 3 - Output, Hide Staircase landing volume (cu. ft.) 20.57 3 - Output, Hide Staircase concrete steps + landing total volume (cu. ft.) 46.49 3 - Output, Hide Staircase steps + landing footprint (sq. ft.) 40.32 2 - Input, Julii Stair ways total (assemblies) 0.00 5 - Price Stair total assemblies (sq. ft.) 0.00 $15.56 $0.00 25% $5.19 $0.00 $20.75 $0.00 Stairs Fourth Floor 1 - Input, User Interior Fourth Floor wall area less RSO (sq. ft.) 0.00 3 - Output, Hide Stair rise individual maximum height (ft.) 3 - Output, Hide Stair quantity (units) 0.00 3 - Output, Hide Stair quantity rounded up (units) 0.00 3 - Output, Hide Stair rise individual height (ft.) NaN 3 - Output, Hide Stair run individual length (ft.) 3 - Output, Hide Stair run total length (ft.) 0.00 3 - Output, Hide Stair concrete step individual area (sq. ft.) NaN 2 - Input, Julii Stair concrete step individual width (ft.) 4.00 3 - Output, Hide Stair concrete step individual volume (cu. ft.) NaN 3 - Output, Hide Stair concrete step total volume (cu. ft.) NaN 2 - Input, Julii Staircase landing width (ft.) 8.00 2 - Input, Julii Staircase landing length (ft.) 4.00 3 - Output, Hide Staircase landing area (sq. ft.) 32.00 3 - Output, Hide Staircase landing slab depth (sq. ft.) NaN 3 - Output, Hide Staircase landing volume (cu. ft.) NaN 3 - Output, Hide Staircase concrete steps + landing total volume (cu. ft.) NaN 3 - Output, Hide Staircase steps + landing footprint (sq. ft.) 0.00 2 - Input, Julii Stair ways total (assemblies) 0.00 5 - Price Stair total assemblies (sq. ft.) 0.00 $15.56 $0.00 25% $5.19 $0.00 $20.75 $0.00 Stairs Fifth Floor 1 - Input, User Interior Fifth Floor wall area less RSO (sq. ft.) 0.00 3 - Output, Hide Stair rise individual maximum height (ft.) 3 - Output, Hide Stair quantity (units) 0.00 3 - Output, Hide Stair quantity rounded up (units) 0.00 3 - Output, Hide Stair rise individual height (ft.) NaN 3 - Output, Hide Stair run individual length (ft.) 3 - Output, Hide Stair run total length (ft.) 0.00 3 - Output, Hide Stair concrete step individual area (sq. ft.) NaN 2 - Input, Julii Stair concrete step individual width (ft.) NaN 3 - Output, Hide Stair concrete step individual volume (cu. ft.) NaN 3 - Output, Hide Stair concrete step total volume (cu. ft.) NaN 2 - Input, Julii Staircase landing width (ft.) NaN 2 - Input, Julii Staircase landing length (ft.) 8.00 3 - Output, Hide Staircase landing area (sq. ft.) NaN 3 - Output, Hide Staircase landing slab depth (sq. ft.) NaN 3 - Output, Hide Staircase landing volume (cu. ft.) NaN 3 - Output, Hide Staircase concrete steps + landing total volume (cu. ft.) NaN 3 - Output, Hide Staircase steps + landing footprint (sq. ft.) 0.00 2 - Input, Julii Stair ways total (assemblies) 0.00 5 - Price Stair total assemblies (sq. ft.) 0.00 $15.56 $0.00 25% $5.19 $0.00 $20.75 $0.00 Exterior Area 3 - Output, Hide Building footprint above ground (sq. ft.) 0.00 4 - Output Show Floors above ground 2.00 4 - Output Show Building footprint above ground (sq. ft.) 0.00 Footings Slab 2 - Input, Julii Footing slab, overhand each side (ft.) 2 - Input, Julii Footing Basement slab, pour area (sq. ft.) 4 2 - Input, Julii Footing Frost Wall slab, pour area (sq. ft.) 9 2 - Input, Julii Basement or Frost Wall Slab? 9 2 - Input, Julii Footing slab, pour thickness (ft.) 5 - Price Footing slab, pour volume (sq. ft.) 9 $14.22 $127.97 25% $4.74 $42.66 $18.96 $170.62 5 - Price Footing slab, insulation 2” R10 Spray Foam (sq. ft.) 9 $4.50 $40.50 25% $1.50 $13.50 $6.00 $54.00 Floor Area Interior/Ceiling Slab 3 - Output, Hide Ceiling Slab (sq. ft.) 4 3 - Output, Hide Levels, including basement (units) 2 3 - Output, Hide Floor Area Interior/Ceiling Slab (sq. ft.) area total 8 5 - Price Floor Area Interior/Ceiling Slab (sq. ft.) area total less stairs area -73 $15.56 -$1,130.28 25% $5.19 -$376.76 $20.75 -$1,507.03 Roof Slab 5 - Price Roof Area, insulation 6” R30 XPS (sq. ft.) 1 $6.66 $6.66 25% $2.22 $2.22 $8.88 $8.88 5 - Price Roof Area, roof Blox topping (sq. ft.) 1 $5.89 $5.89 25% $1.96 $1.96 $7.85 $7.85 5 - Price Roof Area, roof waterproofing (sq. ft.) 1 $4.50 $4.50 25% $1.50 $1.50 $6.00 $6.00 Roof Parapet 2 - Input, Julii Parapet Perimeter (ft.) 0 2 - Input, Julii Parapet Height (ft.) 2 - Input, Julii Parapet Area (sq. ft.) 0 $19.77 $0.00 25% $6.59 $0.00 $26.36 $0.00 4 Parapet waterproofing area (sq. ft.) 0 $4.50 $0.00 25% $1.50 $0.00 $6.00 $0.00 M.E.P. 2 - Input, Julii M.E.P., mechanical pex/sq. ft. of floor (units) 2 - Input, Julii M.E.P., mechanical pex (units) 4.00 $2.40 $9.60 25% $0.80 $3.20 $3.20 $12.80 2 - Input, Julii M.E.P., electrical pex/sq. ft. of floor (units) 5 - Price M.E.P., electrical pex (units) 4.00 $2.15 $8.60 25% $0.72 $2.87 $2.87 $11.47 2 - Input, Julii M.E.P., plumbing supply pex/sq. ft. of floor (units) 0.29 5 - Price M.E.P., plumbing supply pex (units) 1.14 $2.40 $2.74 25% $0.80 $0.91 $3.20 $3.66 2 - Input, Julii M.E.P., plumbing return pex/sq. ft. of floor (units) 0.14 5 - Price M.E.P., plumbing return 4” pipe (units) 0.57 $8.00 $4.57 25% $2.67 $1.52 $10.67 $6.10 Online Calculator Building length exterior (ft.) Building width exterior (ft.) Basement ceiling height (ft.) Ground Floor ceiling height (ft.) 0 Second Floor ceiling height (ft.) Building area above ground (sq. ft.) 0 Cost/sq. ft. (exterior area above ground) $0 Total Price + HST $0 Category Notes Material Labour Other Units Total Costs Delivery Total Units/Delivery Delivery/Unit Total/Cu. Ft. Unit/Cu. Ft. Total/Unit Drawings Drawings Architectural, structural, M.E.P. and site plan $5.00 1 $0.00 $5.00 $5.00 Concrete Floor Area Interior/Ceiling Slab Concrete/cu. ft. LaFarge Agilia Block Fill 30MPA) Colour None $7.08 35.315 $0.63 $7.71 $3.86 Concrete/cu. ft. (Other = colour) LaFarge Agilia Block Fill 30MPA) Colour Low 35.315 $9.34 35.315 $0.63 $9.98 $4.99 Rebar Floor Area Interior/Ceiling Slab Rebar/cu. ft. Fiberglass Rebar 10mm 0.167 $4.38 16,000 $0.13 $4.51 $2.25 Rebar/cu. ft 2’ bent rebar Fiberglass Rebar 10mm $1.25 16,000 $0.13 $1.38 $1.38 Insulation Floor Area Interior/Ceiling Slab Insulation Spray Foam/sq. ft. Spray Foam Cellulose R10 $3.50 $0.00 0 $4.50 Insulation Wall/cu. ft. (Other = machine rental) Supreme Insulation Cellulose R10 $1.43 13,104 $0.15 $1.58 $0.79 Insulation Roof/cu. ft. XPS R30 4.800 $11.88 1,382 $1.45 $13.32 $6.66 Blox Floor Area Interior/Ceiling Slab Blox Exterior/sq. ft. (Other = on site stacking) Colours concrete + colourless concrete + rebar + rebar (since we need enough rebar for 1 cu. ft.)+ Insulation $14.14 $16.64 $3.13 $19.77 Blox Interior/sq. ft. (Other = on site stacking) Colourless concrete + rebar $6.11 $7.36 1,280 $1.56 $8.92 Blox Roof/sq. ft. (Other = on site stacking) Colourless concrete + insulation - rebar $3.86 $5.11 2,560 $0.78 $5.89 Waterproofing Floor Area Interior/Ceiling Slab Waterproofing/sq. ft. Hygrothane $3.50 $0.00 0 $4.50 Concrete Pours Floor Area Interior/Ceiling Slab Concrete Pour vertical forms only/cu. ft. (Other = form assembly/disassembly) Footing slab only $12.22 $14.22 $0.00 $14.22 1 $14.22 Concrete Pour vertical + horizontal forms/cu. ft. (Other = form assembly/disassembly) Ceiling pours $11.56 $15.56 $0.00 $15.56 1 $15.56 Door/Window Bucks HDPE 1/2” 1.5’ Wide (Other = Cutting and Delivery) HDPE Cutting Board (Sanalite) Plastic World 21.333 $17.53 $20.00 $37.53 Galvanized Steel 1/8” 1.5’ Wide (Other = Cutting and Delivery) Galvanized Steel 1/8” 1.5’ Wide’, Metal Supermarket $148 M.E.P. Floor Area Interior/Ceiling Slab M.E.P. Mechanical Pex/sq. ft. Mechanical, HE pex, 1/2” $400/1,000 ft. roll Next Plumbing $1.40 $1.00 $2.40 M.E.P. Electrical Conduit/sq. ft. Mechanical, plumbing supply, material/ft. IPEX 1“ X 300 Feet 100PSI Irrigation Home Depot $1.15 $1.00 $2.15 M.E.P. Plumbing Supply/sq. ft. Mechanical, HE pex, 1/2” $400/1,000 ft. roll Next Plumbing $1.40 $1.00 $2.40 M.E.P. Plumbing Return/sq. ft. Mechanical, plumbing return, material/ft. 4” STR pipe 10’ $30 Home Deport $4.00 $4.00 $8.00 *(Best viewed on MacOS or iOS Safari) -------------------------------------------------------------------------------- Back To Top Julii & Co Inc., 320 North Service Road West, Oakville, ON, L6M 2R7, Canada4164347687info@julii.co +1-416-434-7687 INFO@JULII.CO Copyright 2023 Julii & Co Inc.